Rio Grande Water Conservation District







RGWCD


About us

Board Members

Well Information

Forms and Notices

Minutes and Agendas

Contact us

Links


 Meters and Telemetry

Calendar

RGWCD

News and Events


Important Subdistrict #2 Notice

Deadline for accepting subdistrict #2 formation petitions is extended to March 31, 2015.  Call the District office at 589-6301 and speak to Cleave Simpson or Amber Pacheco if you need assistance.

Rio Grande Natural Area

To view the Bureau of Land Managements Rio Grande Natural Area website click here.

Rio Grande Basin Implementation Plan

The draft Basin Plan has been completed and sent to the Colorado Water Conservation Board. To view the draft plan click here.

Meters and Telemetry

We have created a new page featuring information on meters and telemetry systems. If interested you can view the information by clicking the Meters and Telemetry link on the left of this page.

Testers Available for Surface Water Meter Testing

If you are installing or need a test for a surface water meter click here to see a list of available testers.

2013 Annual Plan

Click Here to view the 2013 Annual Plan.

CDWR Presentation Rio Grande Water Conservation District Board of Managers Meeting

The Colorado Division of Water Resources subdistrict work group session presentation is available for download. (You will need Powerpoint or Powerpoint Viewer to view this file). 

CREP Recharge Incentive

On September 3rd the Subdistrict #1 Board of Managers voted to add an additional recharge incentive for CREP participants. Click Here to view the new CREP recharge incentive.


Update on 2012 Annual Replacement Plan

Click here to read the Division III Water Court decisions on cases 06CV64 and 07CW52.


Verification Testing and Installation of Totalizing Flow Meters on Can Pumps or Pivots 

Subdistrict #1 is requesting a verification test for totalizing flow meters installed on can pumps or center pivots utilizing surface water. If a meter is installed on water being pumped by a can pump from a reservoir or ditch system; please advise your tester to use the attached form by clicking here.  If the meter is installed on a pivot to measure both surface water and groundwater together please contact the Division of Water Resources to insure compliance.  Click here to read the letter submitted to all local well testers and  click here for a list of certified well testers

Substitute Water Supply Plan

The Substitute Water Supply Plan has been approved for the period of May 1st, 2012 to April 30th, 2013. Click Here to read more.
 

Upcoming Events
  • Board of Directors Meeting Tuesday April 21th, at 10:00 a.m. in the Alamosa City Hall Council Chambers located at 300 Hunt Ave. Alamosa, CO 81101. Click here to view the agenda.
Unconfined Aquifer Storage Study



Change In Unconfined Aquifer StorageChange In Unconfined Aquifer West Central ValleyValley_Study_Area

                                                                                                     Click on the Images to Enlarge








 







RGWCD

Projects

Subdistrict #1

Subdistrict # 2

Subdistrict #3

Subdistrict #4

Subdistrict #5

Subdistrict #6